Skip to main content
MicroNet Global

Members' club opening

Soho House Manchester

A seamless rollout in a landmark UK venue

Remote and on-site delivery across four operational floors at Soho House Manchester, atop the historic Granada Studios site.

Operator
Soho House
Location
Manchester, UK
Project
Members' club opening
The bar at Soho House Manchester.

The bar at Soho House Manchester.

The challenge

What the venue needed

A flagship multi-level site above Mollie's Motel and Diner, spanning hospitality floors, guest rooms, a rooftop and wellness facilities. The network had to cross four operational floors and two comms rooms, absorb third-party infrastructure, ISP and access control partners, and match Soho House's global IT framework against a fixed opening date — while supporting a mixed Windows and Apple estate.

Our approach

What MicroNet delivered

  1. 01

    Configured Aruba switches into a scalable backbone across every key floor, with VLAN segmentation, IP schema planning and switch stack configuration managed through SolarWinds.

  2. 02

    Supported setup and integration of dual 1Gbps fibre lines.

  3. 03

    Oversaw deployment of 43 Aruba access points across guest rooms, common areas, rooftop and wellness zones, integrated into Soho House's Aruba Central cloud controller.

  4. 04

    Built the Active Directory structure, group policies and SharePoint hierarchies to Soho House templates, separating front- and back-of-house access.

  5. 05

    Created patching schedules and oversaw CCTV, BMS, door access and IoT integration, with Silver Peak SD-WAN appliances configured and a Netskope SSE transition supported.

  6. 06

    Delivered on-site go-live support, then handed over network diagrams, patching maps and asset registers.

  7. 07

    Provided interim service desk cover through the transition to long-term operations.

Technology & delivery

What was deployed

Aruba switching and 43 Aruba access points
Aruba Central cloud controller
Silver Peak SD-WAN
SolarWinds
Active Directory and SharePoint
Dual 1Gbps fibre

Project notes

  • Published MicroNet project profile
  • Four operational floors, two comms rooms
  • Soho House global IT framework

Outcome

What the venue got

Outcomes as published by MicroNet Global for this project.

01

Strong wired and wireless coverage across the 1st, 7th, 8th and 9th floors, rooftop and spa included.

02

A future-ready architecture with room for further third-party integration.

03

A timely go-live with proactive testing and on-site engineering presence.

04

SharePoint, AD and remote management implemented to Soho House global standards.

Published project profile: micronet.global

Planning an opening, a relaunch or a refurbishment?

Tell us the date and the venue. We will tell you what needs to happen and when.