Skip to main content
MicroNet Global

Restaurant opening

The Ivy Brasserie Chester

Modern IT inside a Grade II listed building

Consultancy, systems supply and technical deployment for a new Ivy Collection venue in the historic centre of Chester, built to the group’s established standards.

Operator
The Ivy Collection
Location
Chester, UK
Project
Restaurant opening
The outdoor dining terrace at The Ivy Brasserie Chester beneath a historic stone arch.

The outdoor dining terrace at The Ivy Brasserie Chester beneath a historic stone arch.

The challenge

What the venue needed

The Ivy Brasserie Chester occupies a Grade II listed building on Newgate Street, where the fabric dictates cabling routes, cabinet positions and access point mounting. As an Ivy Collection venue it also had to arrive on day one running the group’s established Active Directory, file structure and hosted SharePoint templates, with resilient city-centre connectivity and several suppliers coordinated around a fixed practical completion date, in a building with no existing IT infrastructure.

Our approach

What MicroNet delivered

  1. 01

    Specified and configured an HPE Aruba CX switching core sized to the site, with VLAN segregation delivered to the group’s IP and VLAN template and manufacturer support cover on the core switching.

  2. 02

    Completed predictive heat mapping from site floor plans to position the access points, then carried out a physical post-installation survey to verify coverage, balance signal and mitigate interference.

  3. 03

    Added and documented every access point on MicroNet Global’s managed Ruckus cloud controller with the required SSIDs configured.

  4. 04

    Liaised with the ISP to verify the fibre service type, bandwidth and delivery dates, and designed in 4G backup as failover with primary and backup managed SD-WAN devices in the main comms rack.

  5. 05

    Supplied, imaged and configured the back-office estate, and built Active Directory, group policies and the file and folder structure on the hosted SharePoint platform to the templates agreed with the group’s in-house IT team.

  6. 06

    Supplied and installed rack-mount UPS protection with temperature and humidity monitoring, published the patching schedule covering every third-party provider, coordinated the print and telephony installers, and provided onsite standby support through pre-opening, soft opening and public opening.

Technology & delivery

What was deployed

HPE Aruba CX switching core
Ruckus cloud-managed wireless
Wavenet fibre with SD-WAN and 4G failover
Active Directory, group policies and hosted SharePoint
Back-office hardware supply, imaging and user setup
UPS with temperature and humidity monitoring
Managed print and VoIP telephony coordination

Project notes

  • Internal project documentation
  • Grade II listed building
  • Built to Ivy Collection group templates

Outcome

What the venue got

Outcomes as published by MicroNet Global for this project.

01

A listed building fully connected, with switching, wireless and cabling designed around what the fabric allowed and verified by physical survey.

02

Group standards from day one, so the in-house team supports Chester exactly as it supports every other site.

03

Connectivity with a fallback, through primary fibre with managed SD-WAN and 4G failover.

04

A back office ready before the doors opened, with all user hardware imaged, configured and mapped ahead of handover.

05

Protected critical equipment in a comms room that did not exist before the project.

Planning an opening, a relaunch or a refurbishment?

Tell us the date and the venue. We will tell you what needs to happen and when.