Skip to main content
MicroNet Global

Restaurant opening

The Ivy Battersea

Resilient IT for an iconic London opening

Full-scope consultancy, infrastructure and go-live support for The Ivy's Battersea restaurant, delivered to Conway Group standards.

Operator
The Ivy Battersea
Location
London, UK
Project
Restaurant opening
The dining room at The Ivy Battersea.

The dining room at The Ivy Battersea.

The challenge

What the venue needed

A complete IT and network build had to land inside a tight pre-opening window, across a site where point of sale, CCTV, telephony and security were each being installed by a different provider. Connectivity needed a genuine failover path, and every configuration had to match the Conway Group's existing standards for file structure and security.

Our approach

What MicroNet delivered

  1. 01

    Designed and implemented the site LAN on HPE Aruba CX managed switches, with VLAN segmentation separating each connected system.

  2. 02

    Configured SD-WAN over Wavenet fibre with primary and failover circuits.

  3. 03

    Deployed twelve Ruckus Wi-Fi 6 access points — eleven internal, one external — using predictive heatmapping and a physical post-installation survey.

  4. 04

    Supplied and pre-imaged the full hardware suite: laptops, desktop, iPads, tablets and POS printers, with hosted antivirus applied across the estate.

  5. 05

    Built Active Directory, folder structures and the SharePoint environment against Conway Group templates.

  6. 06

    Coordinated Calteq, UKOS and Wavenet into a single patching schedule, with colour-coded cabling for VoIP, PDQ, BMS and CCTV, and APC Smart UPS units protecting critical loads.

  7. 07

    Provided on-site technical support through both the soft opening and go-live.

Technology & delivery

What was deployed

HPE Aruba CX managed switches
Ruckus Wi-Fi 6 with cloud WLAN controller
SD-WAN over Wavenet fibre with failover
Microsoft 365, Active Directory and SharePoint
APC Smart UPS
Hosted antivirus

Project notes

  • Published MicroNet project profile
  • Conway Group IT standards
  • On-site soft opening and go-live cover

Outcome

What the venue got

Outcomes as published by MicroNet Global for this project.

01

A redundant fibre and SD-WAN backbone with real-time monitoring.

02

Signal-balanced Wi-Fi across public and staff areas, managed from the cloud.

03

User devices delivered ready — printers, cloud storage and shared drives already mapped.

04

Zero downtime across the opening events, with project and technical teams on site.

Published project profile: micronet.global

Planning an opening, a relaunch or a refurbishment?

Tell us the date and the venue. We will tell you what needs to happen and when.